Composite geogrid
Compositegeogrid is a material intended for soil reinforcement and excavation work, consisting of a combination of polymer material (polypropylene, polyester, etc.) and non-woven geotextile. Composite geogrid is widely used in constructionqualityroads, railways, reservoirs, bank protection, soil conservation and other areas, which can improve the stability and safety of the project, reduce soil erosion and protect the environment.
Composite geogrid is a geosynthetic material with a unique structure, consisting mainly of a polymer mesh and geotextile.
Material: PP/PET/HDPE
Indicator: According to customer's composite material and specification decision
Peculiarities:
1. High Strength: With excellent tensile, tearing and compressive strength, it can effectively improve the load-bearing capacity and stability of the soil.
2. Corrosion resistance: It has good chemical corrosion resistance and aging resistance, and can be used for a long time in harsh environments.
3. Fatigue Strength: Strong fatigue strength, able to withstand frequent stress and deformation.
4. Water permeability and breathability: The structure's mesh structure allows it to have a certain degree of water permeability and breathability, which is conducive to water drainage and gas exchange in the soil.
5. Flexibility: Can be cut and spliced according to project needs, applicable to various terrains and construction needs.
Application:
Soil Strengthening and Reinforcement: Used to strengthen and strengthen soil in foundation projects such as highways, railways, bridges, etc. to improve the bearing capacity and stability of foundations. |
![]() |
Soil protection and slope protection: Used for soil protection and slope protection on river banks, mountain slopes, road slopes and other places to reduce soil erosion and the risk of landslides. |
|
Soil Conservation and Environmental Restoration: Used in soil conservation and environmental restoration projects to aid soil consolidation and vegetation growth, and protect the ecological environment. |
|
Water Conservation Projects: Used to protect and strengthen soil in reservoir, embankment and canal projects to extend the life of the project and improve safety. |
FREQUENTLY ASKED QUESTIONS
Q: What about the delivery time?
A: Generally 3-15 days after receiving the deposit.
Q: Can you produce products according to customer's requirements?
A: Of course, we are a professional manufacturer, welcome OEM and ODM.










